on 03-23-2011 6:43 PM
Good afternoon, I am trying to run the MRP transaction MD04 but not in this to generate
no order planned. In the article master data have MRP type PD and size
Lot HB. Which fields have to meet so that when I run MRP manages a
order planned?
Thanks
Best Regards,
António Pinho
Hello,
MRP type PD requires external requirement such as Work Order should exist in the system for the Material/Plant. You may use lot size EX (Lot-for-lot order quantity) for this. Since you are using HB(eplenish to maximum stock level), you should use MRP type V1/V2 which are based on Reorder point/Maximum stock level.
Thanks,
Venu