on 03-22-2011 8:01 AM
Hi all SD Gurus,
I have two materials A and B I want B to be replaced when the stock for A is over.
Edited by: sagar7uict on Mar 22, 2011 9:01 AM
hi
u can use vb11 to create material determination records.
and in SPRO in sd basic functions make the appropriate settings.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
You can do the Material determination configuration setting through the navigation path given below:
IMG -> Sales and Distribution -> Basic Functions -> Material Determination -> Maintain prerequisites for material determination.
Then create condition record, for that goto TCODE : VB11
Enter the proposed reason,Material Entered as A and Material as B.
Save the condition record.
After this configuration,once material A in stock is over,material B will be replaced.
With Thanks and Regards,
Priya.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.