on 03-22-2011 5:16 AM
Hi Experts,
I have created one process order. After GR inspection lot is created. I done Result recording for inspection point. Now status of inspection lot is INSP RREC SPRQ QLCH. Now I have change my inspection plan and I try to reset sample by QAC3.
But system throw error that The function you select cannot be carried out:bcoz Inspection active & Result confirmed.
How to solve this.
If you maintained transaction control, you can assign new inspection plan at transaction QA02 after transaction QAC3.
The status 'REL' is not needed for this solution.
Regards
Luke
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
1.Standard way
Reverse original GR document at transaction MBST then GR again.
New inspection lot will be created with correct inspection plan.
2.Not recommend way
Maintain transaction control 'cancel sample' from forbidden to warning for status 'I0212' and 'I0213' at transaction BS22.
You can reset sample at transaction QAC3 then assign correct inspection plan.
Regards
Luke
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As status is
INSP RREC SPRQ QLCH.
Result recording is done.After doing RR its not possible to reset sample !!
For resetting status should be REL
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.