on 03-21-2011 12:23 PM
Dear All,
I am configuring STO between Plant 1 and Plant 2.
These are the settings which I have done.
1.he Sales Area for STO is 3000-Sales Organisation for STO; 50 Distrbn Channel-STO, 00-For STO.
2.A Customer (SUPPLYING PLANT Code-2) has been created and the receiving plant has been created as a Vendor.This Vendor code has been assigned in the Control view of the Customer Master and vice versa.
3.For StO configuration the shipping point has been defined as Plant1 and the customer -> plant has been assigned (Customer Code of Receiving Plant) in the above mentioned Sales area.
4.The delivery type NL has been assigned along with with CRI-01 and SP is Plant1.
5.The final assignment has been done as SPI-Plant1,Plant-Plant2 and Doc.Type-NL.
When I am creating the STO from Plant1 to Plant2 I am getting the following error even though the Shipping Point has been assigned as 01-0003-Plant1-UNPW.The same loading group has been assigned in Mat.Master i.e.0003 and Shipping Condition 01 has been assigned to Customer Master.
When I am doing STO from Plant2 to Plant1 it is working fine.
The error message is as follows
"Not possible to determine shipping point for Material XXXX"
Someone plzzz help.
Regards
Can someone plz. help.
Edited by: bob.sensharma on Mar 21, 2011 1:24 PM
Edited by: bob.sensharma on Mar 21, 2011 1:24 PM
The problem has been resolved.
THX ONCE AGAIN
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Following are settings responsible for STO
1) Customer Master for Receiving Plant & Supplying for corresponding Sales Area(same for both).
2) Vendor Master for Supplying Plant.
3) Material Master need to extend for respective Sales Area
4) MM->Purchasing->Purchase Order->Set Up Stock Transfer Order->Define Shipping Data for both the Plants
Here for both the plants Receiving and Supplying plant should have the Same Sales Area, for both Customer no should
be maintained.
5) Respective "Plant/Shipping Condition (from Customer master)/ Loading Grp(Material Master)" should be maintained.
6) MM->Purchasing->Purchase Order->Set Up Stock Transfer Order->Assign Delivery Type and Checking Rule.
Please recheck the setting mentioned above, this will surely help you solve the problem.
Thank You,
RB.
Edited by: RB@007 on Mar 21, 2011 3:00 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Bob ,
STO from plant 1 to plant 2, material should be extended in the PLANT 1, and sales area of plant 1.
For example, if i am sending a material from CA01 plant (sales area CA01/sto dischannel/ division) to 0101 depot , material should be extended to plant CA01 and the sales area CA01/sto dischannel/ division.
Thanks & Regards,
Hegal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.