on 03-15-2011 11:34 AM
Hello all,
I want to create a production order where the batc number can be assigned for one component as Batch fixed value once the order is released.
1.- I have created the characteristic (CT04) assigned to the table MCHA and field CHARG (Batch number) and one value: LINER.
2.- I have created the class (CL02) and assign to this the characteristic.
3.- I have created the sort ZSORT and the batch (MSC1N).
4.- I have checked the classification in the material and it has assigned correctly the class and characteristic and the MRP2 view has the backflush = 1, batch entry = 3 and the prod. stor. location = COIL.
5.- I have created the strategy (COB1, strategy type CO02) and assigned the selection criteria and sort.
6.- I have created the order (CO01).
7.- I was releasing the order and the batch number was assigned but, with numbers!! and I need assign this with fixed value = LINER.
Could you help me please? How can I do it?
Kind regards,
SP
It was resolved.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.