I have made Sales Order using VA01,

But when i have generate the sales order, the customer order/ cust requirement doesn't appear in MD04

why it doesn't appear in MD04 ?

Regards,

Marufat

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check which schedule line your are determining in sales order under PROCUREMENT TAB.

Go to schedule line details by VOV6, and check TICK MARK is there for transfer of requirement,

also check for requirement class also,

IMG >> SD >> Basic Functions >> Availbility check and Transfer of requirement >> Transfer of requirement

Kapil

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks for the reply,

I use Material with planning strategy 40 in MRP 3 with req type customer KSV,

Availability check is 02

I have checked the procurement tab in sales order , the RqTYpe is also KSV

The Schedule Line Category is CP

I checked in the Transfer of Requirement config where the Req Class is 50 where the Transfer Requirement is already tick

But, still the Customer Req doesnt generate in MD04

Anybody can help me?

Regards

Marufat

Former Member
0 Kudos

Hello Marufat

I think you have done all the necessary checks in order such as:

1. Checked 40 strategy in material master.

2. Activation of Sc line category for flow of requirement

Now I suggest to check

3. The storage location it shouldt be blocked flag.

4. Put SOP requirements MD61 and thn

5. Run MRP to check wheter it bring VSF requirement.

Regards

Raghu

former_member217082
Active Contributor
0 Kudos

Hi Marku

First of all check wheather Transfer of Reqt is checked in the schedule line or not. Secondly also check the Availability check configuration and also check what is the Checking rule