cancel
Showing results for 
Search instead for 
Did you mean: 

ERP to SRM HR Replication Job Streams

Former Member
0 Kudos

Hi,

I’m trying to finalize the production job setup for our ERP to SRM PD and PA replication. I’m interested in knowing how other sites have set this up.

Do you have a delay step/job between each object type (O,C, S and P) replication to make sure that the previous process completes before the next one starts up?

What control steps/jobs do you have in place to ensure that the correct people are notified or the next object isn’t replicated if the pervious object type encounters invalid return codes/errors?

Thanks,

Jerry Martinek

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Jerry,

I did the org structure replication from one EBP client to another EBP.

Not tried for R/3 HR to EBP.

But I think the methodology shold be same.

First you need to create a distribution model in the source system with correct message type (HRMD_ABA & HRMD_B )

then generate the partner profile

distribute this model to partner system

Then transport the org structure with

trx PFAL

first with messaeg type HRMD_ABA which will transport

org units ( O level)

then with message type HRMD_B which will transport attributes

then you can download users from the source system and upload the same in target system with USERS_GEN trx.

BR

Dinesh

Former Member
0 Kudos

Hi Jerry Martinek,

Based on my experience, I would advise you to execute the job manually. The reason is that you have to verify the status of the IDOC in both systems (i.e ERP & SRM) and need to take action if required.

As for the notification, I didn't try so far.

Let me know if you need any other info.

-Pranav