Hi,
How can we add the SO requested delivery date in VL10A? In the standard, it displays only the GI Date, or the Delivery creation Date.
Hi,
The Requested Delivery date is defined by SAP as the date the customer wishes to receive the goods. This is not the same as the day the goods leave the supplier dock, which is common business practice in the US.
SAP uses backward scheduling to determine the Material availability date:
Material Availability Date = Requested Delivery date - Transit time - Loading time - (the greater of: Pick/Pack time or Transportation lead time). The Loading time and Pick/Pack time are configured in the Shipping point. The Transit time and the Transportation lead time come from the Route.
If Route determination is not being used, then Transit time = Transportation Lead time = zero.
If the Pick/Pack time and Loading time are not configured, then Pick/Pack time = Loading time = zero.
If the above are true then Material Availabilty Date = Requested Delivery Date = Delivery Creation Date.
Best regards,
John
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It looks there is no standard way available to add this field. You may need to look for user exit or OSS notes. By the way, when you execute the t.code, you can see the requested delivery date, which can be sorted. Then why you need in selection criteria? Try to convince the user to execute first and in the next screen ask them to use delivery date details for further processing. Also check OSS Note 198137 - VL10: Customer-specific enhancements / user exits is of any use to your scenario.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.