Hi MDM Guru's,
Please Help me, the scenario is this, we client copy the (ERP ECC6) Production Server and copy it to our QA server, since the QAS is a copy of Prod Server the MDM connection is disconnected, can any body help me to reconfigure the connection of the MDM v71 QAS to ECC?
Can anybody send me step on how to reconfigure SAP MDM?
Thanks in Advance
Hi Archie,
Can you reconfirm if MDM is directly interfaced with ECC ?
Ideally PI is used as a middle ware for MDM - ECC integration. So, if ECC Prod is copied to QA, in PI (QA), the specific distribution paths have to be defined for flow of data from MDM to ECC and vice versa.
Hope I have clarified.
Regards,
Vinay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The connection is ECC - PI - MDM and vice versa, we try to configure the distribution path and now is working.
i made changes with material from ECC and material is successfully change in MDM.
the Problem now is the material creation from MDM going to ECC is not working.
can you help me with this?