on 03-07-2011 6:12 AM
Hi gurus
I am creating the lot by MFPR
In routing inspection points are 150, when lot is created first time the MICs are not observed.
When the UD is taken (after getting the information massageu201D The validity period end date for prod. version 0001 has not been reached Message no. QV057)u201D
When the lot created second time the MICs are observed. Why the MICs are not
Observed in first lot? (in fact UD should not taken within the validity period )
Kindly help
MK
Can you tell me
1.what is status of first Inspection lot before UD taken.
2.what is status of second inspection lot before UD
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
but i have to create second lot)
I did not understand why you need to create second inspection lot as you said system only allows only one inspection lot for one production version.
Now as you said system status is
INSP Inspection active
RREC Results confirmed
Means have you confirmed the results ?? ( which means MIC was very much there )
Hi All,
It would be great if any one can share how to resolve Inprocess Inspection in REM environment. Here I am in situation where business wants to create automatic inspection lot periodically or whenever new production version is created.
And if you can forward me some explaination about 3 radio buttons in MFPR as I am not getting F1 help for those buttons.
Let me know if I am not clear about my doubts.
Thanks in advance,
Devang