Scheduling orders within 180 days

Former Member
0 Kudos

Hi, I'm setting up a working environment using CDP and block schedule.

I have the master data set, orders are created correctly but I'm not being able to schedule orders within a period shorter than 180 days. I have tried this in block scheduled and not block scheduled resources and same thing happened in both.

Even if I try to schedule a single order in the whole resource the same thing happens. Resource don't have shuts or things like that defined.

I though the 180 days referred to the planning parameters set up in the resource but if I change this nothing happens.

Any help is welcomed.

Many thanks,

Diego

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Diego,

Check the factory calendar assigned the time streams maintained for resources and re-generate the time stream in the resource. Also check if there is inbound resource (IBR) assigned in the location master. if IBR assigned, check and re-generate the time stream assigned to it.

It should work.

Regards

Venkat DR

Former Member
0 Kudos

What is SNP horizon in product location master (SNP2)?