Change Usage Decision

Former Member
0 Kudos

Hi erybody.

I need to change the Inspection Stage for several Inspection Lots. But this Field is disable.

This is my scenario.

Problem:

1. The supplier create ASN's with lead time around 6 weeks. This

material is shipped by sea.

2. The inspection lot is created with actual Inspection Stage

(IMR). "Skip Lot Automatic"

3. Several Inspection Lots were created by the same way

4. The last Inspection Lot is created urgently and is shipped by air.

5. For the last Inspection Lot was made the Good Receipt from the

warehouse.

6. The material is rejected in Production Line.

7. The quality level is changed in order to check all the pending

Deliveries.

8. But for all lots that was created the Inspection Stage is not

changed.

How can I change the Inspection Stage for pending Deliveries?

Thanks in advance.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member42743
Active Contributor
0 Kudos

Use transaction QDL2 to reset or change the quality level.

FF

Former Member
0 Kudos

As Inspection lots are already created, SAP will not change the stage for them. Any new inspection lot created will go though stage change based on DMR.

For existing inspection lots

Add un-planned MIC in QE02 transaction, This will prevent Auto-UD for skip lots.