on 03-02-2011 9:17 AM
Hi
We have boms with alternative item groups.
for example
A 1 -
FG
B 1 alt Item grp X 20% -
rawmaterial
C 1 alt Item grp X 80% -
rawmaterial
when it is transfered to APO, PPDS PPM is created as follows
A 1
B 0.2
C 0.8 which is fine.
When this is converted to SNP PPM it is cretating PPM as below
A 1
B 1
C 1 so for making 1 A it plans B and C both with eual qty which is duplicating requirement for rawmaterials. Now if i change change the PPM manually it takes 0.2 and 0.8 and distributes the requirements as 20 and 80 % for B and C....
Question is how do i make it take same qty in SNP PPM when converted from PPDS PPM in /SAPAPO/OO_PPM_CONV.
Please Help
Regards
Abhishek
Hi,
Since your base qty of Mat A is 1, to produce 1 A in PPDS PPM the reqd comp B is 0.2 and Comp C is 0.8. But during PPM generation system is rounding these 08. and 02. as 1 EA.
So to resolve this issue need to increase the base qty of material A . After increasing the base qty , CIF the PPM and then convert and see.
Thanks,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.