on 02-28-2011 6:13 AM
Hi ,
My Scenario is RFC -> PI 7.1----->SOAP
Soap Response has to be sent to Idoc as well. So i have configured Sync/Async Bridge for this.
When i test my scenario, I get synchnous time out exceeded error in RWB. And the exception caught in Audit log is
" MP: exception caught with cause com.sap.engine.interfaces.messaging.api.exception.MessageExpiredException: Message 569e70bb-42fd-11e0-cd6b-000000190a5a(OUTBOUND) expired."
I have tested RFC to SOAP without BPM to test soap connectivity. It works fine.
Also in SXMB_MONI i get " Timeout condition of pipeline reached " error.
Can someone suggest what could be the possible cause for this error ?
Thanks
Mohan
Hi Mohan,
you can configure BPM sync/async bridge timeout parameter directly:
SXMB_ADM / Integration Engine Configuration / Configuration / Category SA_COMM / Parameter CHECK_FOR_ASYNC_RESPONSE_TIMEOUT
Default is 60 (seconds), just enhance to 180 (3 minutes) and test.
Regards,
Udo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mohan,
Check the SAP Note: 1363395
Thanks,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check the following guide to investigate the timeout error in sync communication:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.