on 02-24-2011 4:49 AM
Dear Sir
We have maintained inspection type 04 in material master.After Gr from Production an inspection lot is generated.The system picks
Inspection lot start date & End date same as GR date.How to restrict Changing Inspection dates in QA02.Is it possible from Configuration.
With Rgds
Debasish
System derives this date from QM view---->inspection type 04 -
> "time require for Inspection / avg inspection duration"
System calculates the start date & end date depending upon number of days mentions here.Start of inspection will obviously the date at which lot is created.(+ date in this field will be "end date of inspection)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
start date and end date is calculated from Avg. insp. duration in 04 inspection type in material master.
add actual duration in this field it will change the end date accordingly from new lot.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.