Restrict changing inspection lot dates in SAP QM

Former Member
0 Kudos

Dear Sir

We have maintained inspection type 04 in material master.After Gr from Production an inspection lot is generated.The system picks

Inspection lot start date & End date same as GR date.How to restrict Changing Inspection dates in QA02.Is it possible from Configuration.

With Rgds

Debasish

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

System derives this date from QM view---->inspection type 04 -


> "time require for Inspection / avg inspection duration"

System calculates the start date & end date depending upon number of days mentions here.Start of inspection will obviously the date at which lot is created.(+ date in this field will be "end date of inspection)

Former Member
0 Kudos

I was asking how to restrict changing of those dates in QA02.So,that no body can change the dates.These fields will be non editable.

Former Member
0 Kudos

There is no customization......You have to Use "SHD0" t code.

create a STD varient & attach to T code.

Seek Help of your Abaper..............

Former Member
0 Kudos

start date and end date is calculated from Avg. insp. duration in 04 inspection type in material master.