PI Changes

a. Remove the split on PI side to only send 1 message per Idoc to the corresponding vendor

i. Make the change to pull the recipient from the Idoc control record partner

I need to do this change, but in ECC Devopment or in PI development i need to do?

Please anybody help me how to do this change?.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

You need to define the condition using idoc control record for determining the vendor. at the receiver determination level..

for removing the split check the message mapping are there multiple messages in the mapping...if yes then need to remove the same for sending a single message...

HTH

Rajesh

former_member223435
Participant
0 Kudos

But i am not sure about in which interface change need to be. and need to do in Development system rite?.

Former Member
0 Kudos

Hi,

check an already Existing interface mapping from the interface determination and find out the same in IR or ESR..

then goto IR and do the remaining in Dev system

Regds

Rajesh

former_member223435
Participant
0 Kudos

As per the problem we are going to create a copy of PO sending to vendor.

how we can send a copy of a PO from a FAX Vendor to a 3rd Party vendor via Hubspan.

We have come up with a solution, but it will require some work, but I donu2019t think it will be too bad.

Some Configuration are done and Some set up. And some need from PI.

This is the part i am strugggling from PI side

former_member223435
Participant
0 Kudos

from PI side i have to do

PI Changes

a. Remove the split on PI side to only send 1 message per Idoc to the corresponding vendor

i. Make the change to pull the recipient from the Idoc control record partner

But for which target field i have to do?.

former_member223435
Participant
0 Kudos

Please do needful.. its expensive now experts

former_member223435
Participant
0 Kudos

Please anybody help me sir's.

Please do needful.

Former Member
0 Kudos

you need to do it in pi. do you have a ccbpm in your scenario ?

also if you want to route messages based on the receiver from the control record of the idoc you can do that by using the field RCVPRN in segment EDI_DC40

Edited by: ciochinah on Feb 23, 2011 2:00 PM

former_member223435
Participant
0 Kudos

I am not understanding. Please tell me step by step i do it parlally please.