Dear Expert ,
I'm working with Requirement strategy 11 in R3 , what's the equivalent strategy in APO ? Or how i can work with gross requirement in SCM APO
Regards
Rami
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rami,
If you want to have Gross requirement planning in APO PP/DS, this can be done only with the Help of APO ABAP Developer.
Hope the below points may help to work with Developer
1. IN APO SPRO-->Advanced Planning and Optimization -->Supply Chain Planning --> Production Planning and Detailed Scheduling (PP/DS) ---> Heuristics --> Maintain Heuristics
planning Heuristics SAP_PP_002 (Planning of Standard Lots).
2. The Algorithm in the abiove planning Heuristics is /SAPAPO/HEU_PLAN_STANDARDLOTS
3. In The function module /SAPAPO/HEU_PLAN_STANDARDLOTS, you can see the required function /SAPAPO/RRP_NET_REQMTS_CALC.
Please go thro' the above function modules and work with your Developer to get required out put.
Thanks
Siva
Hi Rami,
There is equivalant planning strategy available in APO which is 11 itself. It works similar to R3 but if you are using VMI scenario, then this can't be used for the same. In APO, VMI demand (forecast) is considered as distribution demand and it will get added to your total demand (forecast at location + distribution demand + VMI demand as distribution demand).
Regards
Venkat DR