Hi SAP Guru

As per process; we have 8 stages of manufacturing processes to reach at final product.

We need QM at 7th stage of production and also at 8th stage of production.

So i can use 04 inspection type for inspecting product produced after 8th stage of production, right ?

*Can anybody tell which inspection type i use for product produced at 7th satge?*

Regards

Pooja

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

You can use 03 inspection for inprocess scenarios....Ins lot will get created as soon as the prod order is released.

Mahee

Former Member
0 Kudos

Hi Mahee

7 th stage product is also finished product

and 8 th stage product is also finished product.

Can i use 03 for first and 04 for second?

I think 04 inspection type for both ?

suggest???

Regards

Pooja

Answers (1)

Answers (1)

Former Member
0 Kudos

Use inspection types 03 and 04.

Type 03 is generally used to capture quality data during the production .

While 04 inspection lot is used to control material produced in the end of production order.

You also use both 03 and 04 inspection types at the same time.

Other options are -

1. In the routing you can add quality MIC where you can record result

2. Add extra operation in the routing after stage 7 and 8 with appropriate control keys.

Former Member
0 Kudos

Hi

7 th stage product is also finished product

and 8 th stage product is also finished product.

Can i use 03 for first and 04 for second?

I think 04 inspection type for both ?

suggest???

Regards

Pooja

Former Member
0 Kudos

Hi Pooja,

04 inspection type is used to trigger the inspection lot as soon as GR aginst Prod order. If you want to trigger the inspection lot before it moves to inventory, then you need to use 03. This does not have stock movements and 04 inspection does have stock movements.

Mahee