kindly provide steps to integrate the Grc server to sap backend sys-ver-4.7

Former Member
0 Kudos

Hi Experts,

I have tried to integrate the GRC server to SAP Back end system version-4.7 ; failed to connect due to some errors:

Here is my system configuration:

GRC server successfully configured.

SAP back end system details:

1)patch level by default i got 41 patches after installation.

2)kernel I have upgraded from 620 to 640 successfully.

3) I have updated the spam/saint 21- 36.

My request is while integrating where the problem occurring. I don't know. the above mentioned patch levels are enough to integrate or should i need to upgrade the patches still more...or any specifications in-order to integrate grcserver to sap back end system.

Thanks and regards

Dayakar reddy

Accepted Solutions (0)

Answers (1)

Answers (1)

frank_bannert
Active Participant
0 Kudos

Hi Dayakar,

here you find an installation checklist, you may want to get through it to check whats missing:

http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/50692df1-67da-2b10-2995-84a0d0c82193

Best,

Frank