automatic TR creation in prod order release

Hi Experts,

Could You pls, help me with an automatic TR-creation for prod order components?

We have a WM-PP integrated system (with supply area and control circle etc.) Each time we release a prod order, the material staging need to be done in LP10 tr. action u2013 which is rather mechanic then control action (than LB13 for TO creation out of TR u2013 which is actually our control point, therefore I prefer to have it manually done, so no automatic TO creation). I could find out that the TR creation could be automatic based in prod. sched profile (OPKP), but actually I want this function to be run on raw materials u2013 which has no work scheduling view.

So, the question is: how could I set the system to skip the LP10 and do the material staging / create TR automatically u2013 possible when the prod order is released.

All answer will be appreciated.

Helpful Answer