After running CTM, one demand (quantity: 1,373 TON) was not fullfilled and the following message was shown on the CTM Explanation log:
Fell Short of minimum consumption: Activity 01 / product: 36000001 / location: US01
I already checked minimum lot size on material master and on the source of supply (PDS), both are 0.
PDS (production data structure)
Product I/O type material consumption (variable) Unit
36021075 Output 1.000 TO
36000001 Output 136,444 TO
36000003 Output 4.582 KG
36021086 Input 1.018,23 TO
Demand for product 36021075 (quantity: 1,373 TON) not fullfilled due to incapacity of reaching minimum consumption for product 36000001.
The 36000001 material´s basic unit of measure is TON. When I changed it to KG the demand was fullfilled.
QUESTION:
1 - What is the minimum consumption for a material?
Hi Naveira,
Please have a look at all the output & input components minimum Lot size. Must be one of the output component is having lot size constraint.
Hope this helps.
regards,
Nawanit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.