on 02-02-2011 7:03 AM
Dear Experts,
I have some doubts in determining the materials using the DIP for quotation.
My scenario is like this:
1. I have no. of FG products, which are created as Material master in the system.
2. Each material master is having a BOM.
3. I create an Inquiry for a customer for 1 FG say 12345 for Qty 2
4. Then a project is created for the Inquiry and cost planning is done for the BOM and with some other additional costs, like transportation etc...
5. A total costing is arrived.
6. Create Quotation using DP81.
7. Here in DIP profile i ahve entered the FG with the material determination criteria as the Cost elements
8. System is creating the Quotation.\
Until this is fine...
But when I create Inquiry for a different FG material, say 234578, this also i have entered in the DIP, with same material determination criteria for this material as well (cost element group).
System creates quotation for the material 12345, since the condition matches for this material. I know that the material determination criteria is wrong.
but how can I differentiate 2 materials in the DIP for material determination criteria other than cost element. Since my cost planning will have the same cost element all the times for all the FG material.
Hope I was able to explain you my scenario properly.
What I all need is in material determination criteria, which characteristic I can use so that the 2 fg materials can be distinguished for showing in the quotation based on the cost planning of PS.
I can user WBSE characteristic, but its not a good idea, because every time I create a project I have to enter the WBSE in DIP.
Regards
Praveen
Hi Praveen,
I dont think you need to maintain the material determination in DIP always. This is needed only if you want to replace the material in the source document with the material in the DIP.
This is the scenario in HR timebooking, where a PO will be created without a material and then based on the PO, resources book their time in CAT2 etc..... The costs will be accrued and available in the profile. So for this scenario, if an invoice has to be created using the PO, a material is mandatory and in that scenario, a logical material (say mat with description as Resource Billing) is used.
In your case, you can just leave the material determination blank in DIP. Now the material from the source document will be used for the document created using the DIP in DP* transactions.
On the contrary,
you can also keep the tick Material direct on even if you provide a material in the profile. In this case, it will take teh material from the source document for sure.
Edited by: SNavaneetha Krishnan on Feb 2, 2011 12:56 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Thnx for your reply, I have tried as mentioned above, but with material field blank, it throws an error message in DP81*Charater. combinations W/O mat. assign. DIP profile ZPSSDQT2.
I have even ticked material direct.
for your information in DIP profile the source criteria is blank, the characteristics relevant are as follow:
1. Accounting Indicator
2. Cost Element
3. Material
4. Transaction Currency
5. Unit of Measure
6. WBS Element
Regards,
Praveen
Have you maintained the valid values for all these characteristics. like for cost element, the cost element numbers which are valid for the DIP, the WBS elements which are valid for the DIP etc...
If this is not done, then DIP will not pool the data using these values in the transactions. May be thats why you are facing the problem.
For all the characteristics, you have to select the source and for the sources, you have to maintain the selection criteria. Then your transaction which is assigned to this DIP profile should have only these values for the sources. If this matches, then you will not face any problem.
yes,
I have maintained the required source criteria.
I have got a logic for the material determination, I think I can use WBSE as the material determination criteria. But instead of maintaining individual values, I can create a set for the WBS element and enter all the WBS elements as on required in the set, as it is a front end transaction.
But after creating the set using GS01 or from the DIP profile, it is giving an error message while entering in the set field.
The entry of group ZWBS1 is not valid
Message no. GR383
Diagnosis
The entry of set ZWBS1 is invalid, because it is a selection variant or contains a selection variant.
Since values that are selected with selection variants can change at any time without changing the definition of the group, selection variants cannot be used in the following positions:
In the columns of a Report Writer report
as default sets for set variables
System Response
The entry is rejected.
Procedure
Enter a group that does not contain a selection variant.
Can you please help out in solving the problem.
Praveen
Hi Praveen,
I am not too comfortable with WBS as selection variant. But what i know is that you cannot assign any standard WBS element in DIP. You can assign only those WBS elements which can be assigned int ransactions also. So try it with some other WBS elements in GS02. If it accepts, then may be the problem is with the WBS element. Please post the result so that I can explore little more if I can and need to
Also check the OSS note 169973. It talks something very similar to your problem.
if i understood correctly
you are creating a project by atttaching FG material in project.
then assinging project to inquiry
& running DP81 for quotation ......right
your requirement is you want quotation to have Finished Goods in quotation with quantity & cost
for this
-- create one service material (DIEN) , maintain that in DIP profile Material determination ( no need of FG)
-- add FG in project with quantity , cost , additionals
-- run DP81 , u will get the FG in quotation
for this in DIP , select DI w / material -
in usage
select cost element chr relevent mat det no summ
material chr relevent no summ
obj no chr relevent no summ structuring
obj typ chr relevent no summ
Transaction Currency chr relevent no summ
Unit of Measure chr relevent no summ
select material direct, individual , coversion quantity
let me know if u have any clarifications
if you want the same material to appear in the quotation - the one you entered in inquiry
The in the materila determination source - keep material number blank, tick material direct and individual
In the criteria give the set with material numbers
In the material master cost estimate 1 tab tick material with origin
Hi,
Did you try using Material number itslef as the characterstic?
BR
Anjali
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.