Hi,
User tries to post MIGO 101 for material with QM activated.
For earlier PO, inspection lots are created at MIGO.
For another PO, the inspection lot is not created. The materials goes to unrestricted and the status GR doc has the value 6-Insp. lot already created from previous document.
Plant/Sloc is same for both POs. Also other PO fields seem to be consistent.
What could be the error?
Thanks,
Saurav.
Hi,
Can you please check you inspection type is not deactivated in QM view of material master.
Reg,
NNR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The cause is the control inspection type setting in the 01 inspection type setup. You have already inspected the batch once so no further inspection is required since this setting says so.
Make the change as indicated by the previous poster and you then you'll always get the inspection lot.
Since this is batch managed material, a second inspection can cause batch value changes for you existing stock. A reject of the second receipt can result in restricting you existing stock depending on how your UD process is set up and if you use batch status. This might not be readily apparent to users if they are not trained for it.
FF
Hi Saurav,
I am facing the same issue. Please help how u resolved this issue.
Thanks
Neelima
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.