In dp81 Quantaty is not updated in the Quotation from the Project

Former Member
0 Kudos

Dear All ,

We are in engineering and construction division, as per our business process I have created a project and assign the trading goods to the project and did the cost planning for the project. Inquiry was created which is assigned to WBS and DIP profile . when i try to create a quotation through T.Code-DP81, the system is taking the cost value from the project but it does not take any quantity from the project, the same is assigned to the project.

At the time of quotation creation, itu2019s take the quantity as one but as per the client requirement we need quantity updation in the quotation level.

DIP Profile Configuration settings

T.CODE : ODP1

DIP Profile : PS000001

Select DIP Profile

USAGE: 11 u2013Quotation creation and Sales price-document type AP-Select DI w/Material

Characteristics :

Chartrlevent Mat.Determination ; NoSummarization Strecturi

Cost Element Select Select Select

Material Select Select Select

Object Number Select Select

Tranion Currency select select

Unit Of Measures Select select

Source :

21-Plan cost u2013Total Record 100%

Selection Criteria:

Cost Element Set u20130FRACCT_ALL.GLFUNCT

Material set- 8A-MAT-ALL.GLPCT

Material Determination Material dir Individual

Material Number (which is assigned in Project)u2014Transfer cost and Quantity Select Select

Criteria : material SET-- 8A-MAT-ALL.GLPCT

Accepted Solutions (0)

Answers (2)

Answers (2)

Makal
Active Contributor
0 Kudos

Dear Rao,

Please check your DIP proflie once again. You need to sit with your SD & MM consultants & check all is set at their end.

Regards,

Amaresh Makal

Former Member
0 Kudos

hi

check your DIP profile setting and also the SD related settings