Regarding prod order operations scheduling

Hi all,

We are using CTM planning scenario.

After CTM planning, the operations in a planned order are scheduled as per the capacity available at

resource for each operation. So there is may be a gap between end time of one operation and start time of

the successive operation which is as expected.

Now the issue is:

In ECC, when the planned order is converted into production order, it is eliminating the time gaps between

operations and next operation is started immediately after end time of the preceding operation.

This is happening even after converting planned order into production order using conversion indicator in

APO.

The requirement is, in ECC, system should keep the operation times as scheduled in APO.

Please let me know if any details required.

Regards,

Yogesh