on 01-27-2011 1:23 PM
Hi,
Our scenario is the product P getting manufactured at locations X and Y. Now same demand present on both the locations and we want to identify where to produce how much using optimizer.
Im currently exploring optimizer and trying to build up the solution using docs available on net. I want to give priority to production cost , then transportation cost and then storage cost.
can u pls give detail stpes for building up same in system. Also currently im stuck in creating PPM. is it prerequsite for running optimizer..where to set production cost at location level and how.
Regards,
Vrushali.
HelloVurshali,
First when you say you have same demand in two different location then is this same demand duplicated?
If yes then this is first thing you need to changes because when we talk of mutiple products it will confusion resource requirement
There should be a DC above your manufactuing location and you prioritize supply location using transportation lanes
The other way of doing this is put your demand in one location and through capacity and cost model constrains transfer excess demand to second location through STR
Regarding the other queries I will reply latter
Thankyou
Regards
Arindam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HelloVurshali,
Please check if SNP Str horizon,forecast horizon, SNP prod horizon, PPDS prod horizon is less than your demand date
Secondly check whether procurement type is F in distribution center
Product assignment to transportation lane
Stock should not be available to net off
Prouct location master maintain high non delivery penalty
Maintain SNP PPM or PDS in manufacturing location
Optimizer Profile:
Tick only production constrain to begin with
Cost mimimization
Choose appropriate solution
Thankyou
Regards
Arindam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As suggested by you i've correct demand and i've put demand for product (P) on distribution centre (D) which is connected to two manufacturing locations ( M1 and M2) producing product P.
Before running optimizer i've made following settings,
1) Transport cost i've kept same for product P from M1 to D and M2 to D
2) I've kept production cost higher at M1 in PPM ; PPM is added to active model.
But when im running optimizer in interactive planning for entire network the cost is coming zero. There is no transportation as well as production cost. No SNP planned order created for any manufacturing location.
Can you pls guide in case im missing any seetings or check points. I've hecked log and demand, transportation lanes, PPM , location product getting read.
Regards,
Vrushali.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.