cancel
Showing results for 
Search instead for 
Did you mean: 

QM- delete inspection Plan

Former Member
0 Kudos

Hi Guys,

i have an issue regarding master data and inspection plan.

i need to change the base unit of measure on a material.

when i tried the system gave me this message:

The base unit of measure cannot be changed.

The reasons for this are:

Routings already exist that are assigned to the material.

Type Group GrC Plnt

Q 235723 1 USNA

so i have checked table PLKO and found my material.

i have seen that an Inspection Plan has been created, so i deleted the IP with QP02. went to MM02 tried to change the Bum but same error.

run tcode QSR6 but i am not able to delete this I.Plan. am i missing something?

can you please help?

thanks

C.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

resolved. i selected the delete task list indicator.

C.

former_member42743
Active Contributor
0 Kudos

BTW: for your process you don't need to delete the inspection plan. All you need to do is go to the material assignment screen at the header level of the insp. plan and delete the assignment of the material to the plan. Then, if you wanted to, after changing the BUOM in the material, you could use QP02 to change the UOM used in the inspection plan, and the reassign the material back to it. Save you from having to recreate the plan.

FF