Hello All,

I want to map a scenario such that:

Whenever a order for material is RELEASED it should generate a LOT for say MAIN product ,CO-PRODUCT & BY-PRODUCT(in shrt also for its BOM).

Thanks.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Use Userexit QAAT0001 to create m inspection lot for co-product.

For more help on this user exit refer to link

http://wiki.sdn.sap.com/wiki/display/PLM/QAAT0001Do'sand+Don'ts

Inspection lot so created is manual IL, hence it cannot be used to control stock postings.

And system will automatically create 05 type inspection lot when 531 movement is posted for co-product. Thus you will have two inspection lots for the same co-product.

You may want to review your business requirements and verify you actually need this functionality

Please note -

Inspection lot created for Finished product is different. Initially when order is released

It has no quantity association, but as and when Stock postings are done,

SAP will add these quantities to the IL and control the stock postings.

With manual inspection lot you can not have this functionality without extensive programming.

Hope this helps.