Dear All,
I have some projects which is in released status & i want to change org parameter e.g. company code,controlling area,Business area,Plant & Profit Center @ project as well as WBS level
But in standard ,system will not allowed to change Org Parameter @ project as well as WBS level
I change Org parameter data @ table (PROJ & PRPS) level system allow me to do so
Please let me know is there any impact if i change org parameter data @ table level
Regards
Ravindra
thanks for the suggestions
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Is there any financial postings against these WBS elements whose master data you are trying to change?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You have mentioned that you will change in PROJ & PRPS tables.Are you sure when I draw a project financial report for a particular company code only these two table are effected.That is why I said there will be financial inconsistencies in reports.
Changing at the table level will not change field value in all related tables, which will give raise to inconsistency.
Hi.
You may change the field settings for Project and WBS element using OPUJ and OPUK tcodes. You need not change the table entries. You can make the fields as Input and change them.
BR
Anjali
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Receving below error while changing company code
==================================================================================
Field COMPANY_CODE/Company code: Changing the contents of the field is not permitted
Message no. CJ727
Diagnosis
Contents of field COMPANY_CODE/Company code are to be modified, either by substitution or batch input.
Because the system noted that a field was not ready for input no chnage was allowed.
======================================================================================
Substitution was not carried out
Message no. CJ080
Diagnosis
You want to change the master data of a WBS element using the substitution function. The changes you want may result in inconsistent master data which the system cannot recognize when executing this function.
System Response
The function is not executed.
Procedure
Carry out the desired changes online.
- -
Please do needful
Regards
Ravindra