on 01-14-2011 4:11 PM
I am trying to find out actions/steps that need to be done by the basis consultant to prepare solman test and prod system. Until the system handed over to functional SM consultant. Thanks in advance for your help.
Hello Deejoy,
This information is available in http://service.sap.com/rkt-solman
This resource has all the information required for installation, setup, configuration, operation, etc.
It has various PDF documents, PowerPoints Presentations and Simulations.
There are hundreds of hours of information
Please review http://service.sap.com/rkt-solman for the information you specifically want the Consultant to do.
Regards,
Paul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I agree with Paul.
you can refer to SAP presentations and installation documents.
In short: you can install the latest version of SAP solution manager followed by post-installation activities; and update the dual stack to the latest stack level, as per SAP market place.
The SM consultant can work on the configuration directly; only after having proper network connections along with SAPOSS connections.
The TMS settings can be altered as per scope of the implementation and existing landscape.
Hope this information will help you.
Kind regards,
Raghavendra Rao Noothangi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
10 | |
9 | |
9 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.