on 01-05-2011 9:24 PM
Hi when w eran netwrok heuritic we got errors stating " Planning object could not be determined" From the message I found that some PDS are missing.
Then I ran the TS_LCM_CONS_CHECK and found the same thing .The message that I got is "Activate ppm or remove it from model"
But when I checked the PDS does exist in SCM SNP. Can anybody help me in trouble shooting this
Thanks !!!
Hi
Can you please check if you also have created PPM for any products in APO by T-code /SAPAPO/SCC03 - Production Process Model . As the error shows Active PPM and as per explanation you were checking PDS.
Please also check SAP note : 385602
It might be there is some conflic. Please let us know if it help you.
Thanks
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
NO PPM is not created for any of the material loc that I am testing... in consistency check it says ppm/pds so by ppm its meaning pds,,,,
also i tested by changing the procurement type to external procurement in product master then i dont get that error in heuristic run...
in curto_order_explode i get the message that the material is not in an active integration model....but when i checked in ecc its there in active integration model...so I generated and rimodini that plant again....but still teh problem exists with the heuristic run
Hi Siva,
I had the same problem. Please check SAP Note 1631566.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.