How are SNP order dates decided?

Former Member
0 Kudos

Hi All,

Where do we maintain the settings to tell SNP to generate orders(PRs/STRs/Planned orders) at the begining of the period OR at the end of the period OR in the mid of the period?

Regards

Manotosh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

While maintaining Transaportation Lanes (Transaction: /SAPAPO/SCC_TL1 ), in the u201CMeans of Transportu201D detail screen, you have u201CPeriod Factoru201D field . This Period Factor field is used for Calculating the Availability Date/Time (Factor used by the system to calculate the availability date/time of a receipt element within a time period (bucket) ).

Its use is as below:

The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of t

he period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.

The following applications can take the period factor into account:

u2022 Heuristic in Supply Network Planning (SNP)

The SNP optimizer does not consider any period factor.

u2022 Period lot-sizing procedure in Production Planning and Detailed Scheduling (PP/DS)

There is one more field u201CBucket Offsetu201D and this is also used alon with the above field value, if required.

I hope this gives you insight.

Regards

Datta

Former Member
0 Kudos

thanx Dutta.

it was great. Clearly answered my query.

Regards

Manotosh