cancel
Showing results for 
Search instead for 
Did you mean: 

QE51N Inspection Results and PRT

Former Member
0 Kudos

Hi All,

I have the following scenario:

- Production routing with QM operation and MIC linked to operation

- Also linked to operation I have a list of PRT

- Also linked to MIC I have a one PRT

My questions is about:

- Is that possible to define more than one PRT linked to MIC?

- Because I have a list of PRT linked to QM operation, how can I choose which PRT I use when results recording in QE51N? My nice to have scenario is to define the possible list of PRT to operation and then in results recording, the operator chose the PRT based on that list.

Can anyone help me to achieve this?

Regards

Rogério Reis

Edited by: Rogério Reis on Jan 3, 2011 9:24 AM

Accepted Solutions (1)

Accepted Solutions (1)

former_member207800
Active Contributor
0 Kudos

There is no standard way as SujitSND mentioned already.

An inspection characteristic of plan can have only one PRT.

and

Just idea.. You can try implementation of the inspection point for your requirement.

(You assign a PRT to insp. point when result recording.)

Also I would suggest you develop some function module to select a PRT on insp. point field.

Check the configuration

SPRO > Quality Management > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points

Regards

Luke

Answers (1)

Answers (1)

Former Member
0 Kudos

As I understand there is no standard solution for this neither this can be achieved by customization.

As there is Only one PRT that can be assigned to a MIC & there is no privilege of entering the PRT during the Result Recording.

Also as per std SAP if there are multiple PRT's then these can be entered in the Inspection method which can be seen or go through during the RR.