Result recording inprocess inspection for production order!

Former Member
0 Kudos

Hi,

I have a scenario in for prod order in process inspection.

I have an operation to machine the shaft for 3 hrs. And every hour I need to take an reading and note down in the inspection. For the same reason I created master data of MIC Quantitative, Sampling procedure with sample size 1

On routing for the same material, Usage 1 and status 4 Released for general, Inspection point 200 and sapmle drawing procedure with fixed qty 3.

Generated a prod order and released, got inspection lot for lot origin 03. But when I try to enter 3 different readings per hour could not able to achieve this.

Kindly help me out.

Regards,

N. Nagaraju

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42743
Active Contributor
0 Kudos

Are u using physical samples? If not, I wouldn't use the sample drawing procedure.

Set your characteristic to individual results recording in your control indicators. Set the sampling procedure to be a fixed sample size of three.

You should be able enter three results then for the characteristic.

FF

Former Member
0 Kudos

Hi,

Yes, I want to use physical samples. Can you please suggest me a method using the same.

regards,

N.Nagaraju

former_member42743
Active Contributor
0 Kudos

How can you take a physical sample of a shaft? Physical samples are rarely used for that type of inspection I would think.