DURING MRP RUN MATERIAL IN QI STATUS HOW TO GET MATERIAL OUT OF QI

former_member188029
Participant
0 Kudos

HELLO EXPERTS:

DURING EVERY 24 HOUR MRP RUN 1 OR 2 MATERIALS SHOWS AS BEING IN QI STATUS WHEN IN RESTRICTED STOCK..... MY UNDERSTANDING IS MATERIAL IN RESTRICTED STOCK IS NOT IN QI.....CAN YOU EXPLAIN WHY

Accepted Solutions (1)

Accepted Solutions (1)

kiran_kumar179
Active Contributor
0 Kudos

Dear in SAP generally there are 3 stock statuses are in use most of the time they are Unrestricted,Blocked and QI stock.

When you have activated any inspection setup in MM QM view based on the setup when you do any movement for that material it will create an inspection lot with stock posting to QI,based on your results you can send that QI stock to unrestricted or blocked through Usage Decision(QA11).

Now during MRP run if you don't want to consider the QI stock for net requirement calculation check this badi as in standard SAP You would be able to define only the following stock types not available for MRP run.

1. Stock In Transit

2. Blocked Stock

3. Restricted Use stock.

This you need to configure in OPPQ transaction in the available stock section for the plant.

So in standard it is not possible to restrict QI stock from not considering as available stock, if required you need to look for Implementing BADI "MD_CHANGE_MRP_DATA ", please check with your technical consultant(Abaper).

Cheers

KK

Answers (2)

Answers (2)

former_member188029
Participant
0 Kudos

Thanks very helpful info... solved the problem!!!

VB

Former Member
0 Kudos

Hi,

When Material is posted during GR from Purchase Order (or) Production Order, you may post the stock to QI Stock.

Based Usage decision in Inspection Lot, Stock can be posted to Restricted Stock / Unrestricted Srock.

In MRP, In the config is available to consider (or) do not consider the restricted stock during MRP Run.

Transaction: OPPQ (Available Stocks Option).

Thanks