Tables behind the PPM

Former Member
0 Kudos

Hi,

Can anyone tell me the tables behind the PPM. I have located table /SAPAPO/PLAN but I need to see the tables which links the PPM to the material / resources etc.

Thanks

Mark

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi ,

Some of the tables for PPM are as below.

/SAPAPO/TRPROD--source of supply table for PPM/PDS.

/SAPAPO/MODE

/SAPAPO/REQCAP

Please go to the fields for the same.Also if you can tell the field required for you , I can check the same.

Hope this will help.

regards,

kaushik

Former Member
0 Kudos

Hi Kaushik,

Thanks for your help. What we want to know is how the Structure for Assignment of Product to PPM is stored in the tables. Also where the Minimum lot size and maximum lot size are stored.

Mark

Former Member
0 Kudos

Hi,

You can use the table /SAPAPO/TRPROD for min max lot size.

and for materials assignment you can use the below mentioned tables.

/SAPAPO/COMPALTS

/SAPAPO/COMPALT

/SAPAPO/ND_PPM_M

Hope this will help.

regrads,

kaushik.

Former Member
0 Kudos

Hi Kaushik,

Many thanks for your assistance. I think I have what I need from the information that you have given. Just one thing, do you know why tables /SAPAPO/COMPALTS, /SAPAPO/ND_PPM_M do not return any entries despite we have created PPM's.

Mark

Former Member
0 Kudos

Hi,

The table /SAPAPO/ND_PPM_M is for ND planning results.

The table /SAPAPO/COMPALTS is for TDPP (Time dependent parameters) consumption values.I think you have not maintained time dependent parameters in PPM.

Hope this can help.