In variant DEMAND09 a control parameter is missing

Former Member
0 Kudos

Dear all,

I tried to add a rate step, but I received the following error message.

In variant DEMAND09 a control parameter is missing in step 0050
Message no. AH392

Diagnosis
A control parameter is missing in step 0050 for variant DEMAND09.

System Response
The rate cannot be saved.

Procedure
Maintain the missing values or delete the rate step.

I already configured the VC (variant control) and PC (period control). I am not sure whether there is something else needed to be configured?

Thanks a lot for your time.

Sukasom

1 ACCEPTED SOLUTION

Former Member
0 Kudos

Assign the value from F4 help. Hope that will solve the issue.

Regards,

Jo

View solution in original post

2 REPLIES 2

Former Member
0 Kudos

Assign the value from F4 help. Hope that will solve the issue.

Regards,

Jo

0 Kudos

While using DEMAN09 in your rates , you need to assign a value to the variant control column , for ex Demand09 can multiply and divide two demand values each facility ( mul/Div) is further controlled by variant control in this case.