cancel
Showing results for 
Search instead for 
Did you mean: 

Automatic REORG job in DBA planning calendar always finishes with a warning

Former Member
0 Kudos

Hello SAP Gurus,

Good day!

In our dev system we are always encoutering Automatic REORG job in DBA planning calendar always finishes with a warning.

What settings and parameters should we set to make the warning disappear in the next runs.

Thanks.

kharlos

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

What settings and parameters should we set to make the warning disappear in the next runs

You need to rectify those warnings so that it would not appear the next time anyways can you post the "warning".

Regards,

Salim

Former Member
0 Kudos

Hello,

Below is the part of the job log.

Auto_Reorg:Parameter TESTMODE has not been set

Auto_Reorg:Parameter RUNTIME has been set to " 60"

Auto_Reorg:Parameter TEMPSPACE has been set to "X"

Auto_Reorg:Parameter THRESHOLD_OVERFLOW has been set to " 20"

Auto_Reorg:Parameter THRESHOLD_SIZE has been set to " 1000000"

Auto_Reorg:No tables have been processed

Auto_Reorg:finished with warning

Job finished

The line in bold is the one that Im questioning, does it relates to the No tables that have been processed?

Thanks in advance for your help.

kharlos

Former Member
0 Kudos

The above are only warnings and does not relates to the No tables that have been processed.

Former Member
0 Kudos

Hello Sunil,

Thanks for the response. If the warning does not pertains to the No table have been processed, where can I check the correct or standard values for the other parameters?

kharlos