How to reschedule STOs in BOP jobs in APO?

Former Member
0 Kudos

Dear Friends,

We have a problem in APO BOP .

While running BOP, the STOS are not rescheduled. Upon checking the BOP result, the STOs are displayed with Status 'Unchecked'. and dates are not altered, even though the availability situation has changed.

I would like to know, what needs to be done to reschedule STOs in BOP run?

PS:

1. I have selected the STOs (BI) in the BOP filter criteria.

2. My Sort profile contains the following fields with the priorities indicated on right side.

ERTMS Created on 3

LFTMS Delivery Date/Time 7

LIFPRIO Delivery Priority 1

ORDSTARTTIM Start Time 5

WMENG Requested quantity 9

3. We are using SCM 7.0 with ECC 6.

Regards

Srinath Sastry

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

This required config changes to Check instructions, Check control and business event

Former Member
0 Kudos

Hi Srinath,

You can check your selection in Confirmation situation Tab in BOP Filter and make changes so that STOs can able to reschedule.

Thanks,

Dipankar

Former Member
0 Kudos

Thanks Dipankar..

I had to make some config changes for the check instructions, check control and business event. After this I am now able to make BOP reschedule STOs..