ATP date shifts every time i run ATP

Former Member
0 Kudos

Hi,

I am getting a problem while running ATP for a MTO product. If i run ATP several times it shifts the promised date at a regular interval like 6 days... Please suggest what could be the reason.

Regards

Kaushik

Accepted Solutions (0)

Answers (2)

Answers (2)

reazuddin_md
Active Contributor
0 Kudos

Hi,

What does it meant by ATP date? ist MAD date or delivery date or something else?

- Have you created PO wrt:PR generated by MTO?

or

- Immediate after creation of MTO , are you doing ATP check?

in MTO, system determines MAD date based on lead times mentioned in Inforecord (ME13- purchasing data view).

To determine delivery date system add transit time from route to MAD date.

Regards,

Reazuddin MD

Former Member
0 Kudos

Hi,

thanks for your reply. It is MAD day and similarly delivery date. MTO product is first configured and it cause first ATP check and propose MAD date after 6 days as production date + GR process time is 6 days. But if i manually Re-Triger the ATP it shifts MAD day by 6 days and consecutively the delivery date.

Former Member
0 Kudos

hi,

please check in MMR.

MRP 2:

In-house production 0 days Planned Deliv. Time 0 days

GR Processing Time 0 days Planning calendar

SchedMargin key 000

WORK SCHEDULING:

Lot size dependent Lot size independent

Setup time 0.00 Interoperation 0.00 InhseProdTime 0

Processing time 5.00 Base quantity 1

i think this might be 100% reason on this.

balajia

Edited by: balaji timmampalli achari on Dec 10, 2010 6:16 AM