cancel
Showing results for 
Search instead for 
Did you mean: 

Set Production within a shift in the PPDS PDS

Former Member
0 Kudos

Hi,

Planned and Process orders cannot be longer than one shift (one shift per day).

I have looked at the PDS BADIs in the two sides, APO and R/3:

APO BADI: /SAPAPO/CURTO_CREATE, Method CIF_IMPORT and in the Parameter CT_MODES . I could find component PROD_IN_SHIFT (1 character as date type, boolean)

The R/3 BADI CUSLNTRTO_ADDIN, method CHANGE_CIF_STRUCTURES also contains this Production within a shift component.

The ABAP consultant is telling me that the value is not set in any of those two methods, that when he debugs it, the field is empty all the time.

How can i set that the order are not longer than a shift?

Thanks a lot

CTF

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi guys,

I have just found sap note 802266 which basically states the same as I wrote in my question. Any of these two structures can be used to influence the production within a shift in a pds.

Regards

CTF