cancel
Showing results for 
Search instead for 
Did you mean: 

From XI3.0 SP 19 to PI 7.1 EHP1 system

Former Member
0 Kudos

Hello,

What is the fastest and shortest way to pass all our scenarios from XI3.0 SP 19 to PI 7.1 EHP1 system?

How long does it take?

Thank you

Elad

Accepted Solutions (0)

Answers (2)

Answers (2)

rajasekhar_reddy14
Active Contributor
0 Kudos

it depends on number of interfaces and if java proxies/adapter modules /java mapping there in XI 3.0 then it will take more time.

refer below guide

http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/90baf3dd-dbf9-2b10-47aa-ac5f56bb5030

Regards,

Raj

former_member472138
Active Contributor
0 Kudos

Hi

Your requirement is very broad. The time estimation may vary depending upon how many scenarios you are having in your existing system.

Apart from checking the connection with other systems (which I am sure your Basis team will do), make sure to test

1. XSL mappings (use "XML Toolkit option" in interface mapping if using Java functions);

2. Java proxy - re-compile and test;

3. ABAP proxy - no need to re-generate;

4. Graphical mappings - better to test them.

Fact is that it is better to test most of the critical interfaces after the upgrade.

Also

Check this out

/people/michal.krawczyk2/blog/2009/03/04/pixi-pi-71-upgrademigration--message-mappings

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/40328fc8-4844-2b10-b7a2-8930c16df...

Regards

Pothana