on 11-26-2010 10:04 AM
Dear All,
I have created one new samling procedure and assigned sampling scheme.
INs plan i have assigned this sampling procedure. qualitative.
Sampling Procedure i have maintained 300 use sampling scheme and Attr.insp.non coming units/,manual.
Sampling scheme i have maintained normal inspection and lot is
10 1
50 5
100 10
10000 50
1000000000 10.000
then made GRN and gone to qulaity afterthat whn i am doing results recording this sampling size quantity not coming. its coming as full quantity only.
INs plan i have assigned this sampling procedure. qualitative
It seems that sampling scheme you have created is Quantitative & sampling procedure used is Qualitative....
System should popup for non conforming units ,I am sure its asking for individual values .............try & change sampling procedure to Quantitative
Also make sure that you have ticked on sampling procedure in control indicator & sampling procedure actually exists in the Inspection against each MIC
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sujit,
Thanks for your quick reply. i will tell you the scenario.. For incoming only we are going to inspect the material that too only visual inspection. In this visual they are telling some materials they will do full qty like packing condition, gud conditon etc.
But for some materials 10% only they will inspection.
For this only i have activate qualitative in ins. plan. But sampling procedure i havnt mentioned whether its qualitative or quantiatie...
Could u pls guide me how to do this one.
For incoming only we are going to inspect the material that too only visual inspection. In this visual they are telling some materials they will do full qty like packing condition, gud conditon etc.
But for some materials 10% only they will inspection.
In this visual they are telling some materials they will do full qty Create a sampling procedure--->sampling type = 100%
Select Valuation mode Attribute insp non conf unit.
But for some materials 10% only they will inspection.->Create a sampling procedure->sampling type=10 %
Select Valuation mode Attribute insp non conf unit.
Now attach these Sampling procedures to the respective material & respective MIC's.
Due to attribute & Qualitative MIC's( packing condition) with single Result recording --> system should ask you ok /not ok etc
That's what i think !!
Now last suggestions
1.Check the QM view--->Inspection type have you ticked here
"Inspection plan" ticked or not ( it must be but still make sure)
2.Make sure that you have not ticked on manual sampling etc
Now also check status of the char 2 or 4 etc during the result recording.
Check the status of the inspection lot also what it is
There are only possibilities I can tell you (if task list is attached to the Inspection plan.)
As per you suggestion 1. its in active 2. not ticked
results recording char 10..ins lot status is REL CALC SPRQ before results recording.
GR qty is 50. And doing results recording by defaults is coming 50 as inspected.
after results recording status showing INSP RREC SPRQ.
Task list alreayd attached to the inspeciton plan.
Edited by: madansiva on Dec 3, 2010 9:30 AM
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.