on 11-26-2010 8:37 AM
hi all,
we create a wbs bom and against the same we run MRP.
it is observe that after MRP bom changes as per requirement. is there any restriction in PS that after MRP run user cannot able to change the wbs bom ?
thanks in advance
Edited by: SIng on Nov 26, 2010 2:07 PM
thnks to all
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
Any BOM can be changed with out relevance to the time of MRP run as standard & PS is no exception.
This is an Enhancement. Check whether the exit "CNEX0030" can meet the requirement.