SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

DPC - Operand period is not within billing period

Former Member
0 Kudos

Hi,

we are using DPC , got the following error while executing billing.

Operand period 01.06.2009-30.11.2009 is not within billing period 01.10.2009-30.11.2009

System is calling Category of a period for current billing as 3000 (Current period lies between estimated and actual meter reading result)

as current MR which I have entered is actual and last one is estimated one.

In the config for DPC we have maintained E (Complete Period) for periods to be setup for particular schema + BPCat(3000) + TSG (time slice generator)

Please reply with you valuable inputs.

Thanks in advance.

Regards,

Chetan

1 ACCEPTED SOLUTION

oliviawalsh
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Chetan,

Have you applied note 1492720?

Hope this helps.

Regards

Olivia

View solution in original post

1 REPLY 1

oliviawalsh
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Chetan,

Have you applied note 1492720?

Hope this helps.

Regards

Olivia