Hi,
What happened is that we did the 655 movement and it generated the inspection lot with wrong inspection type (by the way the inspection needed was not existing so user created it after the inspection lot creation. The inspection lot was already cancelled but i have problem with the movement deleteion. How to do it correctly?
Dear would you please elaborate more what do you mean by problem with movement deletion ?
if you want no inspection lot should generate for particular movement type then go to SPRO->QM->Inspection lot
creation->Inspection for goods movement->Select Deactivate Quality inspection for a Movement type select the required
movement type enable QM not active box for which you don't want to inspection lots gets generate and SAVE.
Cheers
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear First check the QA03 transaction for that particular inspection lot to check the inspection type which generated that
inspection lot.
Second if you want to cancel the inspection lot then reverse the transaction which caused for creating that lot or try with QA02
go to Inspection lot > function> Cancel lot then save it if results recording have already done then try with QA12 From menu
bar "Usage Decision" ->Functions->Cancel Lot and then save the lot.
Third if you want to generate inspection lot for particular movement type then go to SPRO->QM->Inspection lot
creation->Inspection for goods movement->select the particular movement type and maintain the required settings.
Check and Revert.
Cheers
KK
Dear Assign the required inspection type in material master and in SPRO->QM->Inspection lot creation--->Inspection for
goods movement--->select the particular movement type and maintain the required settings.
And when ever you do the particular movement for material it will auitomatically creates a inspection lot.
Cheers
KK
Dear there is some confusion in your query you want inspection lot to be generated for particluar inspection type or you don't want to generate inspection lot for particluar movement type?
If you don't want to generate inspection lot for 655 movement type deactivate the inspection tyep in material master QM view as you are saying inspection type is already maintained and go to SPRO->QM->Inspection lot creation->Inspection for goods movement->Select Deactivate Quality inspection for a Movement type select the required movement type enable QM not active box for which you don't want to inspection lots gets generate and SAVE.
Please revert back with clear information if your query is not resolved.
Cheers
KK
Hi,
I will describe from the begining. We did 655 movement and we generated automaticly inspection lot. As in inspection set up we have been missing the right inspection type we had a lot with not correct one. What i did is i deleted the inspection lot that was created automaticly but now i need to regenerate the same inspection lot with a good inspection type. the new inspection type was set up ow in MM03 but i do not know what kind of movement need to do to have my inspection lot created automaticly.
Dear 655 movement type is used in SD for Customer return process if you have activated correct inspection setup in MM and
for 655 in OMJJ if you had alredy maintained required settings then do the customer return process with consulting your SD
consultant it will create a inspection lot.
Cheers
KK
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.