on 11-17-2010 12:57 PM
Hello All,
I have a requirement that is to create a CS order without creating a reservation. At this moment when I insert a material code automatically is generated a reservation, and for our process it is not necessary because the material code is an external service and we do not need to create a reservation to the warehouse.
Can some one help me.
Thanks
RB
hi
taing your question into consideration.
CS means CASH SALES
then you need to go to schedule line category CP and unchec the following : requriment/assembly/availability
or
CS means THIRD PARTY'S SCHEDULE LINE CATEGORY.
if it is third party schdule line category:
1.in ATP configuration you need to Un chec
2.when it comes to CS schedule line part unchec reqriment/assembly/availability for this particular Schedule line category.
hope this helps a lot.
regards
balajia
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can restrict the reservations through Schedule line category ( untick the requirements/assembly) or check in Requirement type.
Regards,
Reazuddin MD
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.