on 11-16-2010 7:02 AM
Hi
i have a problem with inspectn plan
material have an 2 inspetion plans (group no are differtent 1001 and 1002)
both are valid upto 31.12.9999
when am i post the GR for material goes to quality inspection mode..inspection lot has generated but there task list spection has not captured.. then i go to change inspection lot and assign manually...(1001 or 1002)..then do result regarding and UD
now i used insp plan 1002 .... how i configure to system ...system taken it self by default...1002 always how..
regards
ses
Its SAP default when you have two or more task list with same validity date & no vendor maintained in the "material assignment" in the task list header....no task list will automatically attached after lot creation...
now
1.Either put deletion flag to one task list.
2.use the user exit QPAP0002 Enhancement for material/plan assignment, plan selection
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.