Dear Experts,

I've create a kit equipment, a material with sales bom.

I've created in SD a position type for it with Structure Scope B (explode multi level BOM).

For this position type the system doesn't permit to split the schedule lines

Could you help me?

Thanks

Regards

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

i have a question here.

you are expecting two or three schedule lines for a single material which is in BOM.

regars,

balajia