10-28-2010 8:17 AM
Hi,
For Valuation class of Spare we have maintain FC DUMMYINV in derivation rule.
I created PM order and maintain CC M11000 in settlement rule of PM order. when I issue that material against PM order, system use GL 132000 (for credit) and 414075 (for debit).
For debit effect FC M11000 should be derived to consumed budget of CC M11000, but system derives FC DUMMYINV and consuming wrong budget. suggest.
10-28-2010 12:52 PM
Hi,
Please use the instructions from note 666322 which explains how to
activate the trace tool for FMDERIVE. Then, please run the t-code
in question and review the trace log in each and every call. The log
should help you to adjust your FMDERIVE accordingly.
Kind regards
Mar
10-28-2010 12:52 PM
Hi,
Please use the instructions from note 666322 which explains how to
activate the trace tool for FMDERIVE. Then, please run the t-code
in question and review the trace log in each and every call. The log
should help you to adjust your FMDERIVE accordingly.
Kind regards
Mar
10-29-2010 4:51 AM
Hi,
FMDERIVE shows same result because I have maintain it in derivation rule. what else should i do
10-29-2010 7:50 AM
Hi
FMDERIVE is called several times during posting, so have a look at the log in every call, maybe the account assignment gets changed in other steps.
you can also check your settings regarding to availability control:
- If you are using Former budgeting, run report BPINDAN2_NEW with the account assignment that you are deriving, and see what is the referenced account assignment regarding to availability control
- If you are using BCS, the same trace tool as in FMDERIVE is available for the derivation strategies of Control Objects. Just turn this trace On too, and reprocess the posting, to see what Account assignment is used for consuming budget
cheers
Mar
10-29-2010 10:44 AM
Hi,
When I create PM order then correct FC M11000 is picked up as CC M11000 is mentioned in PM order. after this I issue this material for consumption against reservation . In reservation this FC M11000 is not picked up, but FC DUMMYINV is picked from valuation class derivation rule in FMDERIVER. can i pick FC M11000 in reservation. so that it will flow correctly in material issue document.
11-01-2010 3:37 AM
11-01-2010 9:18 AM
Hi, for this propose change Derivation rule "For Valuation class of Spare we have maintain FC DUMMYINV in derivation rule.".
You can exclude derivation FC for Valuation class for this Business Transaction
11-01-2010 9:32 AM
Hi,
This derivation of DUMMYINV for valuation class for spares is maintain purposely. so I cant exclude these. is there any user exit or do I need to take help of abaper.
11-01-2010 9:45 AM
Hi, what do you mean by 'valuation class for spares is maintain purposely'?
11-01-2010 10:19 AM
Hi,
Assignment of DUMMYINV to valuation class of spares is for controlling spares budget only. for R/M and packing material control is not required. so DUMMYINV is assigned to spares valuation class.
11-02-2010 9:44 AM
Hi, I don't understand your issue. You want that FC derived while issuing from reservation(M11000) and not from Derivation(DUMMYINV)?
11-02-2010 9:53 AM
HI,
while issuing material from reservation I need FC M11000 to be used not DUMMYINV. M11000 is available in PM order but DUMMYINV is derived from valuation class. does Function module FMDT_READ_ORDER_PM_FMZUOB helps me.
does order in which I maintain derivation rule affect derivation of FC.
11-02-2010 11:32 AM
Hi, yes I told you befor about it, that you need to change derivation rule. use FM FMDT_READ_ORDER_PM_FROM_FMZUOB-this function reads the account assignment that was entered or derived within Plant Maintenance orders. so you need to create new rule after der. rule in which you derived from Val.class and overwrite this value
11-09-2010 11:28 AM
Hi,
My problem got solved after using Function module FMDT_READ_ORDER_PM_FMZUOB . Thanks for your support.